Hướng dẫn cài đặt solidworks 2013 Informational, Commercial năm 2024

  • 1. 2016 Copyright © 2016 BIM Forum PARTICIPATING ORGANIZATIONS
  • 2. I Version: 2016 October 19, 2016 For Building Information Models Nothing contained in this work shall be considered to be the rendering of legal advice for specific cases, and readers are responsible for obtaining such advice from their own legal counsel. This work and any forms herein are intended solely for educational and informational purposes. Level of Development Specification © 2016 by BIMForum. No portions of this work may be reproduced or displayed without the express written permission of the copyright holders. All rights reserved.
  • 3. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .2 ACKNOWLEDGEMENTS Many thanks to all the individuals and organizations who reviewed and contributed to this work, and to the following industry association representatives and co-chairs of the major discipline subgroups who made this document possible: Overall co-chairs Jan Reinhardt, Adept Project Delivery Jim Bedrick, FAIA, AEC Process Engineering Current Committee Co-Chairs Design Construction Structures Will Ikerd, PE, LEED AP IKERD Consulting, LLC David Merrifield Steel Fab, Inc. Exterior Skin David Spehar, AIA Stantec Architecture Jonathan D. Hill, P.E. Simpson Gumpertz & Heger Walt Cichonski L F Driscoll Interior Construction Ron Dellaria, RA, CSI CannonDesign Brian Filkins The Beck Group Building Services Birgitta Foster VDCO Tech David Francis Murray Company Civil Will Ikerd, PE, LEED AP IKERD Consulting, LLC Dan Russell, LEED AP, Sundt Construction, Inc. Bridge: Highway & Rail Will Ikerd, PE, LEED AP IKERD Consulting, LLC David Merrifield Steel Fab, Inc. Industry association representatives Dmitri Alferieff, Associated General Contractors Michael Bomba, Esq., American Institute of Architects Overall Editing and Graphics Creation IKERD Consulting, LLC [IKERD.com] & BIMxD Solutions, LLC [BIMxD.com]
  • 4. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .3 Additional Contributors In addition, we’d like to thank the many contributors from all sectors of the industry who helped make this specification possible, including: Andy Jizba, US CAD Benjamin Crosby, Yates Construction Bill Klorman, Klorman Construction & ACI 131 BIM Committee Member [Concrete] Brenda Ikerd, Ikerd Consulting, IKERD.com [Structures, Civil] Brian Skripac, Assoc. AIA, LEED AP BD+C, CannonDesign, AIA TAP KC Chuck Eastman, Ph.D, Georgia Institute of Technology David Merrifield, Steel Fab, Inc. Eloisa Amaya, Ikerd Consulting, IKERD.com [Graphics Editing, Structures, and Cover] Jamie L. Davis, PE. LEED AP, Ryan Biggs | Clark Davis Engineering & Surveying [Masonry] Jason P. Lien, PE, Precast Concrete Institute [PCI] BIM Committee, EnCon United [Precast] Joe Cipra, Vulcraft/Verco Group [Structural Steel Open Web Joists and Metal Deck] Joe Powell, EIT, Ikerd Consulting, IKERD.com [MEP] John Russo, AIA, President, US Institute of Building Documentation [Laser Scanning & Level Of Accuracy] Kirk Capristo, Astorino [Cover] Lee Garduno, Southland Industries [MEP] Luke Faulkner, LEED AP, AISC [Structural Steel] Matthew J. Gomez PE, SE, Gerdau [Structural Steel] Michael Bolduc, PE [MA], Simpson Gumpertz & Heger [Structural] Michael Gustafason, PE, Autodesk [Structural] Michael Mulder, Southland Industries [MEP] Murat Karakas, Arup [MEP] Paul J. Hause, PE, Structural Consultants Inc. [Structural] Peter J. Carrato, Ph.D., PE, SE, Bechtel & ACI 131 BIM Committee Chair [Concrete] R. Wayne Muir, P.E., Structural Consultants Inc. & SEI-CASE BIM Committee Co-Chair [Structures] Rebecca Stanford, Ikerd Consulting, IKERD.com [Structures] Roger Becker, PE, SE, Precast Concrete Institute [PCI] Managing Director of Research and Development [Precast] Scott Babin, ITW Building Components Group [Wood] Soheil Seiqali, Klorman Construction [Concrete] Steven Bumbalough, ITW Building Components Group [Wood]
  • 5. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .4 CONTENTS INTRODUCTION........................................................................................................................................................................................9 1 Overview ............................................................................................................................................................................................9 1.1 Description................................................................................................................................................................................9 1.2 Intent.......................................................................................................................................................................................10 1.3 Background.............................................................................................................................................................................10 2 Levels of Development.....................................................................................................................................................................11 2.1 BIM as a Communication Tool................................................................................................................................................11 2.2 Level of Development vs. Level of Detail ................................................................................................................................11 2.3 Fundamental LOD Definitions ................................................................................................................................................12 2.4 Example – Light Fixture: .........................................................................................................................................................13 3 Using the Specification.....................................................................................................................................................................13 3.1 Glossary..................................................................................................................................................................................13 3.2 Details.....................................................................................................................................................................................13 3.3 Project-Specific Information ....................................................................................................................................................14 3.4 Using the Specification with a BIMXP.....................................................................................................................................14 3.5 Implementation of the Specification ........................................................................................................................................15 4 Organization of the Specification......................................................................................................................................................15 4.1 Geometric and Attribute Information .......................................................................................................................................15 5 Updates of This Document ...............................................................................................................................................................19 5.1 Revision History......................................................................................................................................................................19 5.2 Revision Process ....................................................................................................................................................................19 PART I – ELEMENT GEOMETRY ...........................................................................................................................................................20 A 21-01 SUBSTRUCTURE..................................................................................................................................................................20 A10 21-01 10 Foundations.............................................................................................................................................................20 A1010 21-01 10 10 Standard Foundations................................................................................................................................20 A1020 21-01 10 20 Special Foundations...................................................................................................................................26 A20 21-01 20 Subgrade Enclosures...............................................................................................................................................29 A2010 21-01 20 10 Walls for Subgrade Enclosures..................................................................................................................29 A40 21-01 40 Slabs-on-Grade .......................................................................................................................................................30 A4010 21-01 40 10 Standard Slabs-on-Grade ..........................................................................................................................31 A4020 21-01 40 20 Structural Slabs-on-Grade .........................................................................................................................32 A4030 21-01-40-30 Slab Trenches TBD ...................................................................................................................................33 A4040 21-01-40-40 Pits and Bases TBD..................................................................................................................................33 A4090 21-01-40-90 Slab-On-Grade Supplementary Components TBD....................................................................................33 A60 21-01-60 Water and Gas Mitigation TBD ................................................................................................................................33 A6010 21-01-60-10 Building Subdrainage TBD........................................................................................................................33 A6020 21-01-60-20 Off-Gassing Mitigation TBD ......................................................................................................................33 A90 21-01-90 Substructure Related Activities TBD.......................................................................................................................33
  • 6. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .5 A9010 21-01-90-10 Substructure Excavation TBD...................................................................................................................33 A9020 21-01-90-20 Construction Dewatering TBD ..................................................................................................................33 A9030 21-01-90-30 Excavation Support TBD ..........................................................................................................................34 A9040 21-01-90-40 Soil Treatment TBD ..................................................................................................................................34 B 21-02 00 00 SHELL.........................................................................................................................................................................35 B10 21-02 10 Superstructure .........................................................................................................................................................35 B1010 21-02 10 10 Floor Construction......................................................................................................................................35 B1020 21-02 10 20 Roof Construction ......................................................................................................................................56 B1080 21-02 10 80 Stairs..........................................................................................................................................................57 B20 21-02 20 Exterior Vertical Enclosures.....................................................................................................................................64 B2010 21-02 20 10 Exterior Walls.............................................................................................................................................64 B2010.20.10 21-02 20 10 20 10 Exterior Walls [Wood]..............................................................................................................68 B2010.20.20 21-02 20 10 20 20 Exterior Walls [Cold-Form Metal Framing] ..............................................................................70 B2020 21-02 20 20 Exterior Windows .......................................................................................................................................78 B2050 21-02 20 50 Exterior Doors and Grilles ..........................................................................................................................83 B2070 Exterior Louvers and Vents...........................................................................................................................................85 B2080 21-02 20 80 Exterior Wall Appurtenances......................................................................................................................86 B2090 21-02 20 90 Exterior Wall Specialties ............................................................................................................................87 B30 21-02 30 Exterior Horizontal Enclosures.................................................................................................................................87 B3010 21-02 30 10 Roofing.......................................................................................................................................................87 B3020 21-02 30 20 Roof Appurtenances ..................................................................................................................................88 B3040 21-02 30 40 Traffic Bearing Horizontal Enclosures ........................................................................................................89 B3060 21-02 30 60 Horizontal Openings...................................................................................................................................91 B3080 21-02 30 80 Overhead Exterior Enclosures ...................................................................................................................91 C 21-03 INTERIORS............................................................................................................................................................................93 C10 21-03 10 Interior Construction.................................................................................................................................................93 C1010 21-03 10 10 Interior Partitions........................................................................................................................................93 C1020 21-03 10 20 Interior Windows ......................................................................................................................................103 C1030 21-03 10 30 Interior Doors ...........................................................................................................................................104 C1040 21-03 10 40 Interior Grilles and Gates .........................................................................................................................107 C1060 21-03 10 60 Raised Floor Construction........................................................................................................................107 C1070 21-03 10 70 Suspended Ceiling Construction..............................................................................................................108 C1090 21-03 10 90 Interior Specialties....................................................................................................................................110 C20 21-03 20 Interior Finishes .....................................................................................................................................................112 C2010 21-03 20 10 Wall Finishes............................................................................................................................................112 C2020 21-03 20 20 Interior Fabrications .................................................................................................................................114 C2030 21-03 20 30 Flooring ....................................................................................................................................................114 C2040 21-03 20 40 Stair Finishes ...........................................................................................................................................115 C2050 21-03 20 50 Ceiling Finishes........................................................................................................................................116 D 21-04 00 00 SERVICES ................................................................................................................................................................117 D10 21-04 10 Conveying..............................................................................................................................................................117
  • 7. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .6 D1010 21-04 10 10 Vertical Conveying Systems.....................................................................................................................117 D1030 21-04 10 30 Horizontal Conveying ...............................................................................................................................118 D1050 21-04 10 50 Material Handling .....................................................................................................................................119 D1080 21-04 10 80 Operable Access Systems .......................................................................................................................122 D20 21-04 20 Plumbing................................................................................................................................................................123 D2010 21-04 20 10 Domestic Water Distribution.....................................................................................................................123 D2020 21-04 20 20 Sanitary Drainage ....................................................................................................................................128 D2030 21-04 20 30 Building Support Plumbing Systems ........................................................................................................131 D2050 21-04 20 50 General Service Compressed-Air.............................................................................................................135 D2060 21-04 20 60 Process Support Plumbing Systems........................................................................................................135 D30 21-04 30 Heating, Ventilation, and Air Conditioning [HVAC] ..............................................................................................137 D3010 21-04 30 10 Facility Fuel Systems ...............................................................................................................................137 D3020 21-04 30 20 Heating Systems......................................................................................................................................140 D3030 21-04 30 30 Cooling Systems ......................................................................................................................................142 D3050 21-04 30 50 Facility HVAC Distribution Systems .........................................................................................................145 D3060 21-04 30 60 Ventilation ................................................................................................................................................148 D3070 21-04 30 70 Special Purpose HVAC Systems .............................................................................................................152 D40 21-04 40 Fire Protection .......................................................................................................................................................153 D4010 21-04 40 10 Fire Suppression......................................................................................................................................153 D4030 21-04 40 30 Fire Protection Specialties........................................................................................................................154 D50 21-04 50 Electrical ................................................................................................................................................................155 D5010 21-04 50 10 Facility Power Generation ........................................................................................................................156 D5020 21-04 50 20 Electrical Service and Distribution............................................................................................................158 D5030 21-04 50 30 General Purpose Electrical Power ...........................................................................................................161 D5040 21-04 50 40 Lighting ....................................................................................................................................................162 D5080 21-04 50 80 Miscellaneous Electrical Systems ............................................................................................................164 D60 21-04 60 Communications ....................................................................................................................................................166 D6010 21-04 60 10 Data Communications..............................................................................................................................166 D6020 21-04 60 20 Voice Communications ............................................................................................................................166 D6030 21-04 60 30 Audio-Video Communication....................................................................................................................166 D6060 21-04 60 60 Distributed Communications and Monitoring............................................................................................166 D6090 21-04 60 90 Communications Supplementary Components ........................................................................................166 D70 21-04 70 Electronic Safety and Security ..............................................................................................................................166 D7010 21-04 70 10 Access Control and Intrusion Detection ...................................................................................................167 D7030 21-04 70 30 Electronic Surveillance.............................................................................................................................167 D7050 21-04 70 50 Detection and Alarm.................................................................................................................................167 D7070 21-04 70 70 Electronic Monitoring and Control ............................................................................................................167 D7090 21-04 70 90 Electronic Safety and Security Supplementary Components ................................................................167 D80 21-04 80 Integrated Automation............................................................................................................................................167 D8010 21-04 80 10 Integrated Automation Facility Controls ...................................................................................................167 E 21-05 00 00 EQUIPMENT & FURNISHINGS .................................................................................................................................167
  • 8. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .7 E10 21-05 10 Equipment..............................................................................................................................................................168 E1010 21-05 10 10 Vehicle and Pedestrian Equipment ..........................................................................................................168 E1030 21-05 10 30 Commercial Equipment............................................................................................................................169 E1040 21-05 10 40 Institutional Equipment.............................................................................................................................171 E1060 21-05 10 60 Residential Equipment .............................................................................................................................172 E1070 21-05 10 70 Entertainment and Recreational Equipment.............................................................................................172 E1090 21-05 10 90 Other Equipment Associated Masterformat Sections: 11 90 00...............................................................173 E20 21-05 20 Furnishings ............................................................................................................................................................174 E2010 21-05 20 10 Fixed Furnishings....................................................................................................................................174 E2050 21-05 20 50 Movable Furnishings ................................................................................................................................175 F 21-06 00 00 SPECIAL CONSTRUCTION & DEMOLITION.........................................................................................................176 F10 21-06 10 Special Construction.............................................................................................................................................176 F1010 21-06 10 10 Integrated Construction...........................................................................................................................176 F1020 21-06 10 20 Special Structures Associated Masterformat Sections: 13 30 00 / 01 88 13 ..........................................176 F1030 21-06 10 30 Special Function Construction Associated Masterformat Sections: .........................................................185 F1050 21-06 10 50 Special Facility Components Associated Masterformat Sections:............................................................185 F1060 21-06 10 60 Athletic and Recreational Special Construction........................................................................................185 F1080 21-06 10 80 Special Instrumentation............................................................................................................................186 F20 21-06 20 Facility Remediation Associated Masterformat Sections: ......................................................................................186 F2010 21-06 20 10 Hazardous Materials Remediation ...........................................................................................................186 F30 21-06 30 Demolition..............................................................................................................................................................186 F3010 21-06 30 10 Structure Demolition................................................................................................................................186 F3030 21-06 30 30 Selective Demolition.................................................................................................................................186 F3050 21-06 30 50 Structure Moving......................................................................................................................................186 G10 21-07 10 Site Preparation .....................................................................................................................................................187 G1010 21-07 10 10 Site Clearing.............................................................................................................................................187 G1020 21-07 10 20 Site Elements Demolition .........................................................................................................................187 G1030 21-07 10 30 Site Element Relocations .........................................................................................................................187 G1050 21-07 10 50 Site Remediation......................................................................................................................................187 G1070 21-07 10 70 Site Earthwork..........................................................................................................................................187 G20 21-07 20 Site Improvements.................................................................................................................................................188 G2010 21-07 20 10 Roadways ................................................................................................................................................188 G2020 21-07 20 20 Parking Lots .............................................................................................................................................189 G2030 21-07 20 30 Pedestrian Plazas and Walkways ............................................................................................................189 G2040 21-07 20 40 Airfields ....................................................................................................................................................189 G2050 21-07 20 50 Athletic, Recreational, and Playfield Areas ..............................................................................................190 G2060 21-07 20 60 Site Development.....................................................................................................................................190 G2080 21-07 20 80 Landscaping.............................................................................................................................................190 G30 21-07 30 Liquid and Gas Site Utilities ...................................................................................................................................190 G3010 21-07 30 10 Water Utilities...........................................................................................................................................190 G3020 21-07 30 20 Sanitary Sewerage Utilities ......................................................................................................................191
  • 9. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .8 G3030 21-07 30 30 Storm Drainage Utilities ...........................................................................................................................191 G3050 21-07 30 50 Site Energy Distribution............................................................................................................................191 G3060 21-07 30 60 Site Fuel Distribution ................................................................................................................................192 G3090 21-07 30 90 Liquid and Gas Site Utilities Supplementary Components ....................................................................192 G40 21-07 40 Electrical Site Improvements .................................................................................................................................192 G4050 21-07 40 50 Site Lighting .............................................................................................................................................193 G50 21-07 50 Site Communications.............................................................................................................................................194 G5010 – Site Communications Systems ........................................................................................................................................194 G90 21-07 90 Miscellaneous Site Construction............................................................................................................................195 G9010 21-07 90 10 Tunnels ....................................................................................................................................................195 CIVIL ......................................................................................................................................................................................................196 Highway Bridges Precast Structural I Girder [Concrete] ....................................................................................................................196 Highway Bridge Girder Steel ..............................................................................................................................................................198 Railroad Bridges Precast Structural I Girder [Concrete].....................................................................................................................199 Railroad Bridge Girder Steel...............................................................................................................................................................201 Graphics Index ............................................................................................................................................................................................ i
  • 10. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .9 INTRODUCTION 1 Overview 1.1 Description The Level of Development [LOD] Specification is a reference that enables practitioners in the AEC Industry to specify and articulate with a high degree of clarity the content and reliability of Building Information Models [BIMs] at various stages in the design and construction process. The Specification is a detailed interpretation of the LOD schema developed by the American Institute of Architects [AIA] for its E202- 2009 BIM and Digital Data Exhibit and updated for its G202-2013 Project BIM Protocol Form1 , defining and illustrating2 characteristics of model elements of different building systems at different Levels of Development, organized according to CSI Uniformat 20103 . Its intent is to help explain the LOD framework and standardize its use so that it becomes more useful as a communication tool. The LOD Specification adheres to the intent of the LOD schema as developed by the AIA, and as such it is important to emphasize several points here. 1.1.1 LODs and Design Phase The LODs are not defined by design phases. Rather, design phase completion, as well as any other milestone or deliverable, can be defined through the LOD language. There are several important reasons for this approach: 1] There is currently no detailed standard for the design phases. Many architects have created in-house standards, but these differ from one firm to the next, and even within a single firm the requirements are sometimes adjusted to the needs of a particular project. 2] Building systems progress from concept to precise definition at different rates, so at any given time different elements will be at different points along this progression. At completion of the Schematic Design phase, for example, the model will include many elements at LOD 200, but will also include many at LOD 100, as well as some at LOD 300, and possibly even LOD 400. 1.1.2 LODs and Model Definition There is no such thing as an “LOD ### model.” As previously stated, project models at any stage of delivery will invariably contain elements and assemblies at various levels of development. As an example, it is not logical to require an “LOD 200 model” at the 1 AIA Contract Document G202-2013, Building Information Modeling Protocol Form is part of a series of digital practice documents the AIA published in June 2013. This series consists of AIA E203™–2013, Building Information Modeling and Digital Data Exhibit, AIA G201™–2013, Project Digital Data Protocol Form, and AIA G202™–2013, Project Building Information Modeling Protocol Form. For general information on the documents and downloadable samples see www.aia.org/digitaldocs. For executable versions of the documents see //www.aia.org/contractdocs. 2 All images are intended to illustrate building conditions in compliance with common building codes. However, the images do not take into account site specific conditions, regional building codes and other important information that may require a material change for specific projects. These illustrations do not make representation for fitness for a particular project nor for code or design compliance. 3 UniFormatTM Numbers and Titles used in this publication are from UniFormatTM , published by CSI and Construction Specifications Canada [CSC], and are used with permission from CSI. For a more in-depth explanation of UniFormatTM and its use in the construction industry visit //www.csinet.org or contact CSI, 110 South Union Street, Suite 100, Alexandria, VA 22314. [800] 689-2900.
  • 11. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .10 completion of the schematic design phase. Instead, the “100% SD Model” will contain modeled elements at various levels of development. 1.2 Intent 1.2.1 Not a set of Requirements The Specification is not a set of requirements as to what is modeled when or by whom. Rather it is a language by which users can define these requirements for their own firms or projects. This clear articulation allows model authors to define what their models can be relied on for, and allows downstream users to clearly understand the usability and the limitations of models they are receiving. To accomplish the Specification’s intent, its primary objectives are: 1] To help teams, including owners, to specify BIM deliverables and to get a clear picture of what will be included in a BIM deliverable 2] To help design managers explain to their teams the information and detail that needs to be provided at various points in the design process, and to track progress of their models 3] To allow downstream users to rely on specific information in models they receive from others. 4] To provide a standard that can be referenced by contracts and BIM execution plans. 1.2.2 Complements a BIM Execution Plan [BIMXP] This Specification does not replace a project BIMXP, but rather is intended to be used in conjunction with such a plan, providing a means of defining models for specific information exchanges, milestones in a design work plan, and deliverables for specific functions. 1.3 Background 1.3.1 AIA Effort In 2008, the AIA published its first set of Level of Development definitions in AIA Document E202™ -2008 Building Information Modeling Protocol. Due to the rapidly evolving nature of the use of BIM, the AIA evaluated the E202–2008, including the LOD definitions. The result is the updated and reconfigured Digital Practice documents, AIA E203™–2013, Building Information Modeling and Digital Data Exhibit, AIA G201™–2013, Project Digital Data Protocol Form, and AIA G202™–2013, Project Building Information Modeling Protocol Form, which are accompanied by a detailed guide document entitled Guide and Instructions to the AIA Digital Practice Documents. The AIA’s updated Digital Practice documents include revised LOD definitions. 1.3.2 BIMForum Effort In 2011 the BIMForum initiated the development of this LOD Specification and formed a working group comprising contributors from both the design and construction sides of the major disciplines. To help further the standardization and consistent use of the LOD schema, and to increase its usefulness as a foundation for collaboration, the AIA licensed the BIMForum to utilize its latest LOD definitions in this Specification. The BIMForum working group first interpreted the AIA’s basic LOD definitions for each building system, and then compiled examples to illustrate the interpretations. Because BIM is being put to an ever increasing number of uses, the group decided that it was beyond the initial scope to address all of them. Instead, the definitions were developed to address model element geometry, with three of the most common uses in mind – quantity take-off, 3D coordination and 3D control and planning. The group felt that in taking this approach the interpretations would be complete enough to support other uses. 1.3.3 LOD Definitions The LOD definitions that are used in this Specification are identical to those published in the AIA’s updated Digital Practice Documents, with two exceptions. 1] First, the working group identified the need for an LOD that would define model elements sufficiently developed to enable detailed coordination between disciplines – e.g. clash detection/avoidance, layout, etc. The requirements for this level are higher than those for 300, but not as high as those for 400, thus it was designated LOD 350. The AIA documents do not include LOD 350, but the associated Guide and Instructions references it.
  • 12. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .11 2] Second, while LOD 500 is included in the AIA’s LOD definitions, the working group did not feel it was necessary to further define and illustrate LOD 500 in this Specification because it relates to field verification. Accordingly, the expanded descriptions and graphic illustrations in this Specification are limited to LOD 100-400. 2 Levels of Development 2.1 BIM as a Communication Tool The LOD schema addresses several issues that arise when a BIM is used as a communication or collaboration tool, i.e., when someone other than the author extracts information from it: 1] During the design process, building systems and components progress from a vague conceptual idea to a precise description. In the past there has been no simple way to designate where a model element is along this path. The author knows, but others often don’t. 2] It’s easy to misinterpret the precision at which an element is modeled. Hand drawings range from pen strokes on a napkin to hard lines with dimensions called out, and the precision of the drawing can be inferred from its appearance. In a model though, a generic component placed approximately can look exactly the same as a specific component located precisely, so we need something besides appearance to tell the difference. 3] It is possible to infer or extract information from a BIM that the author doesn’t intend – unconfirmed dimensions can be measured with precision, assembly information often exists before it’s been finalized, etc. In the past, this issue has been sidestepped with all-encompassing disclaimers that basically say, “Since some of the information in the model is unreliable, you may not rely on any of it.” The LOD framework allows model authors to clearly state the reliability of given model elements, so the concept becomes “Since some of the information in the model is unreliable, you may only rely on it for what I specifically say you can.” 4] In a collaborative environment, where people other than the model author are depending on information from the model in order to move their own work forward, the design work plan takes on high importance – it is necessary for the model users to know when information will be available in order to plan their work. The LOD framework facilitates this. The LOD Framework addresses these issues by providing an industry-developed standard to describe the state of development of various systems, assemblies, and components within a BIM. This standard enables consistency in communication and execution by facilitating the detailed definition of BIM milestones and deliverables. 2.2 Level of Development vs. Level of Detail LOD is sometimes interpreted as Level of Detail rather than Level of Development. This Specification uses the concept of Level of Development. There are important differences. Level of Detail is essentially how much detail is included in the model element. Level of Development is the degree to which the element’s geometry and attached information has been thought through – the degree to which project team members may rely on the information when using the model. In essence, Level of Detail can be thought of as input to the element, while Level of Development is reliable output.
  • 13. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .12 2.3 Fundamental LOD Definitions 4 2.3.1 LOD 100 The Model Element may be graphically represented in the Model with a symbol or other generic representation, but does not satisfy the requirements for LOD 200. Information related to the Model Element [i.e. cost per square foot, tonnage of HVAC, etc.] can be derived from other Model Elements. BIMForum Interpretation: LOD 100 elements are not geometric representations. Examples are information attached to other model elements or symbols showing the existence of a component but not its shape, size, or precise location. Any information derived from LOD 100 elements must be considered approximate. 2.3.2 LOD 200 The Model Element is graphically represented within the Model as a generic system, object, or assembly with approximate quantities, size, shape, location, and orientation. Non-graphic information may also be attached to the Model Element. BIMForum interpretation: At this LOD elements are generic placeholders. They may be recognizable as the components they represent, or they may be volumes for space reservation. Any information derived from LOD 200 elements must be considered approximate. 2.3.3 LOD 300 The Model Element is graphically represented within the Model as a specific system, object or assembly in terms of quantity, size, shape, location, and orientation. Non-graphic information may also be attached to the Model Element. BIMForum interpretation: The quantity, size, shape, location, and orientation of the element as designed can be measured directly from the model without referring to non-modeled information such as notes or dimension call-outs. The project origin is defined and the element is located accurately with respect to the project origin. 2.3.4 LOD 350 The Model Element is graphically represented within the Model as a specific system, object, or assembly in terms of quantity, size, shape, location, orientation, and interfaces with other building systems. Non-graphic information may also be attached to the Model Element. BIMForum interpretation. Parts necessary for coordination of the element with nearby or attached elements are modeled. These parts will include such items as supports and connections. The quantity, size, shape, location, and orientation of the element as designed can be measured directly from the model without referring to non-modeled information such as notes or dimension call-outs. 2.3.5 LOD 400 The Model Element is graphically represented within the Model as a specific system, object or assembly in terms of size, shape, location, quantity, and orientation with detailing, fabrication, assembly, and installation information. Non-graphic information may also be attached to the Model Element. BIMForum interpretation. An LOD 400 element is modeled at sufficient detail and accuracy for fabrication of the represented component. The quantity, size, shape, location, and orientation of the element as designed can be measured directly from the model without referring to non-modeled information such as notes or dimension call-outs. 4 The definitions for LOD 100, 200, 300, 400, and 500 included in this Specification represent the updated language that appears in the AIA’s most recent BIM protocol document, G202–2013, Building Information Modeling Protocol Form. The LOD 100, 200, 300, 400 and 500 definitions are produced by the AIA and have been used by permission. Copyright © 2013. The American Institute of Architects. All rights reserved. LOD 350 was developed by the BIMForum working group. Copyright © 2013. The BIMForum and the American Institute of Architects. All rights reserved.
  • 14. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .13 2.3.6 LOD 500 The Model Element is a field verified representation in terms of size, shape, location, quantity, and orientation. Non-graphic information may also be attached to the Model Elements. BIMForum interpretation. Since LOD 500 relates to field verification and is not an indication of progression to a higher level of model element geometry or non-graphic information, this Specification does not define or illustrate it. 2.4 Example – Light Fixture:  100 cost/sf attached to floor slabs  200 light fixture, generic/approximate size/shape/location  300 Design specified 2x4 troffer, specific size/shape/location  350 Actual model, Lightolier DPA2G12LS232, specific size/shape/location  400 As 350, plus special mounting details, as in a decorative soffit 3 Using the Specification 3.1 Glossary The expanded definitions in this Specification use the following interpretations of these terms: 3.1.1 Specific: The quantity, size, shape, location, and orientation of the element as designed can be measured directly from the model without referring to non-modeled information such as notes or dimension call-outs. 3.1.2 Actual: The model element includes all the qualities of a specific element and is representative of the manufacturer’s model to be installed or the construction intent of an assembly. 3.2 Details 3.2.1 Order of Precedence The body of this Specification expands on the Fundamental Definitions as they apply to specific building systems and sub-systems. In the event of any conflict, more specific expansions take precedence over less specific expansions and Fundamental Definitions, e.g. the expanded definitions for C1010 take precedence over those for C10, which in turn take precedence over the Fundamental Definitions. 3.2.2 LOD Definitions as Minimum Requirements The LODs provide five snapshots of the progression of an element from conceptual to specified – there are many steps in this progression between the defined LODs. The LOD definitions, then, should be considered minimum requirements – i.e. an element has progressed to a given LOD only when all the requirements stated in the definition have been met. 3.2.3 LOD Definitions are Cumulative For a given element each LOD definition includes the requirements of all previous LODs. Thus for an element to qualify for LOD 300 it must meet all the requirements for 200 and 100 as well as those stated in the LOD 300 definition. 3.2.4 Model Element Author This document does not prescribe who the author of a particular component at a given LOD should be – the sequence of responsibility for modeling various systems will vary from one project to another. To accommodate this variation this document defers to the concept
  • 15. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .14 of Model Element Author [MEA] as defined in the AIA E203-2013: “The Model Element Author is the entity [or individual] responsible for managing and coordinating the development of a specific Model Element to the LOD required for an identified Project milestone, regardless of who is responsible for providing the content in the Model Element." 5 3.2.5 2D Supplementary Drawings In current practice models are often supplemented with 2D information such as detail drawings. This Specification does not address this supplementation, but rather deals only with what is actually modeled in 3D and non-graphic information associated with the modeled elements. 3.3 Project-Specific Information As mentioned in the Overview above, this Specification is intended to be used in conjunction with a project BIMXP. Many information needs will vary from project to project, even for identical elements. This kind of information is therefore not included in the LOD definitions specified here, but rather is left to be addressed in individual BIMXPs. The following are some notable examples. 3.3.1 Size Thresholds In most projects a determination is made to model certain elements only if they are over a specified size – e.g. conduit less than 1/2” [10 mm] diameter is not modeled. These size thresholds do not consistently correspond to certain LODs, and they vary from project to project. Thus they are not specified in the LOD definitions but rather in the project’s BIMXP, for example through the “Notes” cells in the Model Element Table of the AIA G202-2013. 3.3.2 Clearances Clearances such as door swings, maintenance access zones, and accessibility requirements can be critical design issues and in many cases are geometrically modeled to reserve the space. The implementation of this type of spatial coordination can be accomplished in various ways; therefore, it is neither practical nor useful for this Specification to dictate particular requirements, for example, all door swings to be modeled as quarter-cylinder solids. Implementation of required clearances is to be established within individual BIMXPs. 3.4 Using the Specification with a BIMXP Most BIMXPs include a section that details milestones as well as information exchanges – models to be produced to exchange specific information at specific points in a specific BIM use. In most cases, though, current practice is to accompany these models with the common “for reference only” disclaimer, diluting the effectiveness of the exchange. Referencing this Specification in the BIMXP and using it to concisely define the milestone and information exchange models brings many efficiencies to the process – among them: 3.4.1 Reliance As noted above [see “BIM as a Communication Tool”], a major problem with allowing others to rely on a BIM is that it can contain information the author doesn’t intend. By defining a model through the LOD Specification the author can limit reliance to only what he/she specifically states. 3.4.2 Multiple uses Much model information is common across several information exchanges. This Specification facilitates the definition of models that will support multiple exchanges. 5 AIA Document E203-2013 Building Information Modeling and Digital Data Exhibit, Article 1.4.6. Copyright © American Institute of Architects 2013. All rights reserved. Definition quoted here by permission.
  • 16. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .15 3.4.3 Efficient sequencing The development of models as the design and construction process progresses follows logical sequences – much information depending on the prior development of other information. The definition of milestones, information exchanges, and other deliverables through this Specification facilitates the orderly sequencing of models to align with efficient development of information. 3.4.4 Avoidance of over-modeling The LOD Specification facilitates the application of a pull-planning process to the modeling effort, limiting the development of model elements and information to that which the team identifies as useful. Note that the definition and sequencing of models usually cannot be set in stone when the BIMXP is first developed. In most cases the modeling plan must evolve as the project progresses. 3.5 Implementation of the Specification Currently, two methods of implementation have been developed. 3.5.1 Rely on the Model Element Table Project team refers to the model element table included in an AIA G202 document or a BIM execution plan for the LODs of model elements. In this method all elements referred to in a given model element table line item are assumed to be at the LOD stated there. E.g. if the table lists interior doors as LOD 200 for a given model, all interior doors within the model are assumed to be at LOD 200. 3.5.2 Include LOD Designations as Attributes of Individual Model Elements All elements within the model are provided with two attributes – Current LOD [the actual LOD of the element] and Target LOD [the LOD specified for that element in the model element table]. Elements default to a Current LOD of 100 or 200 as appropriate, and this attribute is elevated as the element is more fully developed. This method offers more flexibility and reliability, allowing differentiation between individual elements within a single model element table line item. Several software offerings provide the functionality of highlighting elements of various LODs or elements whose Current LOD is less than the Target LOD. 4 Organization of the Specification 4.1 Geometric and Attribute Information To facilitate use of this Specification Attachment 1, Model Development Specification [MDS] has been provided. This attachment is a set of spreadsheets that can be used to collect and correlate LOD Information for a specific project. A model element can contain two types of information: a] the element’s geometry and b] associated numeric and/or textual attributes. To address these types of information this Specification contains two parts: 4.1.1 Part I: Element Geometry Part I consists of narrative descriptions and illustrations of specific model elements at each LOD. Part I forms the bulk of this document. 4.1.2 Part II: Associated Attribute Information Part II is contained in Attachment 1, a workbook that begins with the Model Element Table which mirrors the layout of the Model Element Table in the AIA G202-2013 Building Information Modeling Protocol Form, and can be referenced by that document. The Model Element Table references Attribute Tables that contain attribute information for various building systems.
  • 17. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .16 4.1.3 Model Element Table Figure 1 4.1.4 Building Systems The rows of the Model Element Table [Figure 1] are building elements listed in accordance with CSI Uniformat 2010. The table also lists Relevant Attribute Tables for each system, referring to the tabs containing attribute information for the associated system[s]. If desired users can add Attribute Tables for specific line items. 4.1.5 Milestones/Deliverables The table includes columns for defining the LODs for various milestones within a project. Each milestone column has three sub- columns: Level of Development [LOD], Model Element Author [MEA], and Notes. The table in Attachment 1 shows standard milestones for the completion of the traditional design phases as well as examples of Project-Specific Milestones for interim reviews, specific deliverables, BIM-Use information exchanges, etc. Users are encouraged to modify and add to these milestones as necessary. Once the milestones for a project have been determined, they can be re-ordered into a logical sequence as in Figure 2. Figure 2
  • 18. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .17 4.1.6 Attribute Tables Figure 3 4.1.7 Attribute Table Anatomy Attribute Tables consist of three parts. 1] Part 1, Attribute Description, lists Attributes relevant to the associated building system[s]. Attributes are grouped into two categories as shown – Baseline and Additional.  The Baseline is the suggested list of attributes to be populated when no other requirements are known [BIM Uses, specific deliverables, etc.].  The Additional category may be thought of as a “shopping list” – a list of possible attributes the team may want to consider. 2] Part 2, LOD Profile, correlates Attribute requirements with LODs from the Model Element Table. Attributes with pre-populated LOD Profiles show a correlation between Attributes and LODs that represents current practices of proficient BIM users. An “X” can be entered in these cells to indicate simply that the attribute is required at a given LOD, or an Attribute Author can be entered to indicate not only that the attribute is required but also who is responsible for providing it. 3] Part 3, Milestones, is used to mark the attributes required for specific milestones and deliverables. The tables in Attachment 1 include example milestones, but users will customize the tables by copying the milestones they created for the Model Element Table.
  • 19. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .18 4.1.8 MEPF Attribute Tables The MEPF attribute tables use a somewhat different format than other sections, since components from multiple systems might be used to make up a specific element. Case in point, an air handler is primarily a D30 HVAC element, but can include plumbing, fire protection and electrical elements as well. The MEP Systems tabs are grouped into two types:  System component elements: D20 Plumbing, D30 HVAC, D40 Fire Protection and D50 Electrical.  System distribution elements such as ducts, pipes, and cables: D Air Distribution, D Fluid Gas Distribution and D Electrical Distribution. MEPF attribute tables are broken down into two main sections  Global: Attributes that are common to all elements within the table  Item-Specific: The suggested set of additional attributes that are specific to an individual type of element. In many tables the Individual elements are organized into a hierarchy of classes and sub-classes. In these cases the attributes applicable to a specific element include those listed for the element itself plus those listed in any of the classes above it in the hierarchy. E.g. as Figure 4 shows, the attributes for an oil meter include all those shown in bold. Note: System Component elements use both the Global and Item-Specific attributes sections, while System Distribution elements use only the Item-Specific attribute section. 4.1.9 Using the Attribute Tables There are many ways to use the Attribute Tables – three are shown here. 1] Project teams adopt the Baseline attribute lists. The pre-populated correlation between Attributes and LODs represents current practices of proficient BIM users in the AEC industry. 2] Project teams create a custom correlation between LODs and Attribute population requirements. In this case the project team would edit the LOD Profile section to reflect the specific requirements of the project. 3] Project teams create new, project specific milestones and define Attribute population requirements in the Milestones sections. This approach will give project teams the greatest flexibility for defining Attribute population requirements. Note that the element attribute author can be entered in the LOD profile instead of an “x” to indicate who is responsible for providing the information. Figure 4
  • 20. Specification Version: 2016 www.bimforum.org/lod Back to TOC Copyright © 2016 by BIMForum. All rights reserved .19 5 Updates of This Document While this document is intended as a reference that can be cited in agreements such as contracts and BIM execution plans, it is recognized that the use of BIM in design and construction is evolving. To accommodate this evolution this document will be updated periodically in clearly identifiable versions. A project can adopt a specific version and then has the option to remain with that version or update if a new version is published. Initially the target update frequency is annually, but that may change in the future. In addition, interim updates may be issued if needed. 5.1 Revision History 10/17/16 Level of Development Specification 2016 08/25/16 Level of Development Specification 2016 DRAFT FOR PUBLIC COMMENT New changes are noted with a bold bar. Engineered metal building structures, precast concrete, highway and rail road bridge content moved from Appendix to main body. 10/30/15 Level of Development Specification 2015 New changes are noted with a bold bar. Definitions have not been changed except for minor grammatical corrections and formatting. New content released as an Appendix to Part A for engineered metal building structures, precast concrete, highway bridge content and rail road bridge content. 4/30/15 Level of Development Specification 2015 DRAFT FOR PUBLIC COMMENT New changes are noted with a bold bar. Definitions have not been changed except for minor grammatical corrections and formatting. Part B, Model Element Table, and Attribute Tables were added. 12/30/14 Level of Development Specification 2014 New changes are noted with a bold bar. Definitions have not been changed except for minor grammatical corrections and formatting. Images and image notes have been added in blue italics font. 8/22/13 Level of Development Specification 2013 4/24/13 Initial draft for public review 5.2 Revision Process 5.2.1 Public Comment Each new version is first released as a draft for public comment. Feedback is evaluated and resolved prior to the publishing of the official version. 5.2.2 Appendix An increasing number of professional organizations are adopting this Specification and providing additional content relating to their domains. To accommodate information that becomes available after the public-comment release but prior to the final release, content is developed in collaboration with industry organizations and leading expert practitioners, and then vetted by the LOD working group. This content is released as an Appendix to Part A and as additional identified Attribute Table tabs in Part B. The new content is then integrated into the next public comment draft.
  • 21. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .20 PART I – ELEMENT GEOMETRY A 21-01 SUBSTRUCTURE Associated Masterformat Sections: 01 82 00 A10 21-01 10 Foundations Associated Masterformat Sections: 01 82 13 100 Assumptions for foundations are included in other modeled elements such as an architectural floor element or volumetric mass that contains layer for assumed structural framing depth. Or, schematic elements that are not distinguishable by type or material. Assembly depth/thickness and locations still flexible. 200 Element modeling to include:  Approximate size and shape of foundation element  Structural building grids for local project coordinate system are defined in model and coordinated with global civil coordinate system [State Plane Coordinate System, etc.] A1010 21-01 10 10 Standard Foundations Includes: Formwork, concrete, masonry and reinforcement. Includes Standard Foundation Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Associated Masterformat Sections: 100 See A10 200 See A10 300 Elements are modeled to the design-specified size and shape of the foundation. Element modeling to include:  Overall size and geometry of the foundation element  Sloping surfaces or floor depressions  External dimensions of the members  Main openings such as elevators and other shafts A1010.10 21-01 10 10 10 Wall Foundations [Shallow Foundations] Associated Masterformat Sections: 03 30 00 / 03 40 00 / 04 20 00 / 06 14 00 100 See A10
  • 22. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .21 200 See A10 Image Notes: 1] Generic wall foundation is modeled. 2] Site is generically modeled from geotechnical information in geotechnical report. 300 Element modeling to include: 1] Overall size and geometry of the foundation element 2] Sloping surfaces. 3] External dimensions of the members 4] Geotechnical bearing strata elevation is modeled from geotechnical report. Image Notes: 1] Wall foundation sizes are accurately modeled with footings where applicable. 2] Bearing elevation is modeled from the geotechnical report. 3] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 4] See slab on grade for related conditions at this LOD. 6 A1010.10-LOD-300 Wall Foundation 4 2 1 3 5 A1010.10-LOD-200 Wall Foundation
  • 23. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .22 350 Element modeling to include:  Location of sleeve penetrations  Pour joints  Moisture retarder  Dowels  All exposed embeds or reinforcement such as lintels  Expansion joints  Geotechnical Bearing Strata is modeled from geotechnical report estimates.  Area of bearing influence Image Notes: 1] Grade beam sizes are modeled with interfaces to other systems such as but not limited to slab turn downs, key-ways between concrete pours, construction joints and reinforcing dowels into adjacent pours. 2] Bearing elevation is modeled from the geotechnical report with the addition on interface elements such as void boxes where applicable. 3] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 4] See slab on grade for related conditions at this LOD. 7 A1010.10-LOD-350 Wall Foundations [Shallow Foundations] 400 Element modeling to include:  Rebar including hooks and lap splices  Dowels  Chamfer  Coursing for unit masonry defined  Waterproofing A1010.30 21-01 10 10 30 Column Foundations [Deep Foundations] Associated Masterformat Sections: 03 30 00 100 See A10 200 See A10 4 2 1 3
  • 24. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .23 300 Element modeling to include:  Assumed bearing depth per geotechnical report with designed penetration geometry modeled.  Top of Pier  Size of Pier Image Notes: 1] Pier sizes are accurately modeled with top of pier elevation, estimated depth to bearing and specified depth of penetration into bearing strata. 2] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 1 2 8 A1010.30-LOD-300 Column Foundations [Deep Foundations]
  • 25. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .24 350 Element modeling to include:  Actual Top of Pier [TOP] and expected Bottom of Pier [BOT] modeled per engineer’s review of site conditions  Foundation dowel locations and anchor rods if applicable. Image Notes: 1] Pier sizes are accurately modeled with interfaces to other systems such as but not limited to slab turn downs, key-ways between concrete pours, construction joints and reinforcing dowels into adjacent pours. 2] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 9 A1010.30-LOD-350 Column Foundations 1 2
  • 26. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .25 400 Element modeling to include:  Depth to bearing stratum  Penetration into bearing stratum  Locations of lap splices  Rebar including hooks and lap splices  Dowels  Pier sled or Pier wheel for side clear cover  Pier bolster for bottom clear cover Image Notes: 1] Pier modeling is developed to include all fabrication content that is part of the element. 2] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 3] Pier sled, pier wheel, pier bolsters and other related items are not shown in image for clarity. 10 A1010.30-LOD-400 Column Foundations 1 2
  • 27. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .26 A1010.90 21-01 10 10 90 Standard Foundation Supplementary Components TBD A1020 21-01 10 20 Special Foundations Includes: Drilling, casing, bell bottom, excavation, dewatering, removal of excavated, materials, reinforcing, and concrete. Drilled Piers, Driven Piles, Mat Foundation, elevator pits. Associated Masterformat Sections: 31 60 00 100 See A10 200 See A10 300 See A1010  Elevator pit slabs are sloped correctly  Sump pits are shown at correct locations and geometries 350 Element modeling to include:  Location and size of sleeve penetrations and MEP openings  Pour joints  Dowels  All elements needed for cross-trade collaboration are to be modeled  Actual location and shape of structural element  Exposed embeds or reinforcement such as lintels  Penetrations detailed and modeled  Expansion joints 400 Element modeling to include:  Rebar detailing including hooks and lap splices  Dowels  Chamfer  Moisture retarder  Coursing for unit masonry defined  Waterproofing A1020.10 21-01 10 20 20 Driven Piles TBD A1020.20 21-01 10 20 20 Caissons TBD
  • 28. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .27 A1020.30 21-01 10 20 30 Special Foundation Walls TBD A1020.40 21-01 10 20 40 Foundation Anchors TBD A1020.50 21-01 10 20 50 Underpinning TBD A1020.60 21-01 10 20 60 Raft Foundations TBD A1020.70 21-01 10 20 70 Pile Caps TBD A1020.80 21-01 10 20 80 Grade Beams Includes: Formwork, reinforcement, and concrete. Associated Masterformat Sections: 03 30 00 100 See A10 200 See A10 Image Notes: 1] Generic beam geometry is shown. 2] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 11 A1020.80-LOD-200 Grade Beams 2
  • 29. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .28 300 See A1010 Image Notes: 1] See slab on grade [A4010, A4020] for related conditions at this LOD. 3] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 12 A1020.80-LOD-300 Grade Beams 350 Element modeling to include: 1] Water stops 2] Pour joints and sequences required to identify reinforcing lap spice, scheduling, etc. Image Notes: 1] Grade beam sizes are modeled with interfaces to other systems such as but not limited to slab turn downs, key-ways between concrete pours, construction joints and reinforcing dowels into adjacent pours. 2] Interface elements such as void boxes or critical bearing zones are modeled where applicable. 3] See slab on grade [[A4010, A4020] for related conditions at this LOD. 4] Geotechnical regions are shown for context and not required to be modeled as part of this element at this LOD. 13 A1020.80-LOD-350 Grade Beams 400 Element modeling to include:  Detailed post-tensioned components  Rebar including hooks and lap splices  Dowels  Chamfer  Waterproofing 2 1 3 2 1 3 4
  • 30. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .29 A20 21-01 20 Subgrade Enclosures Associated Masterformat Sections: 01 82 16 / 01 82 16 / 01 82 16 / 01 82 16 100 Solid mass model representing overall building volume; or, schematic wall elements that are not distinguishable by type or material. Assembly depth/thickness and locations still flexible. 200 Element modeling to include:  Approximate size and shape of the subgrade enclosure element.  Structural building grids for local project coordinate system are defined in model and coordinated with global civil coordinate system [State Plane Coordinate System, etc]. Suggested Baseline Attributes  Member Type A2010 21-01 20 10 Walls for Subgrade Enclosures Includes: Perimeter walls enclosing building space below grade. Includes formwork, reinforcing, concrete and masonry. Includes Subgrade Enclosure Wall Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Associated Masterformat Sections: 100 See A20 200 See A20 300 Element modeling to include:  Overall size and geometry of the subgrade element  Sloping surfaces  External dimensions of the element
  • 31. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .30 350 Element modeling to include:  Chamfers  Sleeve penetrations  Pour joints  Rebar and any embedded elements modeled at congested areas where specified by project BIMXP which is typically with in a set distance from the area of congestion.  Any permanent shoring or forming structures such as void boxes  insulation  Expansion joints  Moisture retarder  Exposed embeds or reinforcement such as lintels  Penetrations detailed and modeled  Expansion joints 400 Element modeling to include:  Rebar including hooks and lap splices  Dowels  Chamfer  Coursing for unit masonry defined  Waterproofing A2010.10 21-01 20 10 10 Subgrade Enclosure Wall Construction TBD A2010.20 21-01 20 10 20 Subgrade Enclosure Wall Interior Skin TBD A2010.90 21-01 20 10 90 Subgrade Enclosure Wall Supplementary Components TBD A40 21-01 40 Slabs-on-Grade Associated Masterformat Sections: 01 82 00 100 Assumptions for slabs are included in other modeled elements such as a volumetric mass or architectural floor element that contains a layer for assumed structural framing depth.
  • 32. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .31 200 Element modeling to include  Generic slab with approximate thickness.  Structural building grids for local project coordinate system are defined in model and coordinated with global civil coordinate system [State Plane Coordinate System, etc.] 14 A40-LOD-200 Slabs-on-Grade A4010 21-01 40 10 Standard Slabs-on-Grade Includes: Slab construction supported continuously by earth or compacted fill. Includes fine grading, subbase layer, mud slab, insulation, vapor retarder, waterproofing, formwork, expansion joints, control joints, reinforcement, concrete, and finishing includes: Slabs-On-Grade Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Associated Masterformat Sections: 03 30 00 100 See A40 200 See A40 300 Element modeling to include:  Overall size, thickness and geometry of the slab  Slab depressions  Edge turn downs  Material strength  Surfaces modeled to actual slopes 15 A4010-LOD-300 Standard Slabs-on-Grade
  • 33. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .32 350 Element modeling to include:  Sleeve penetrations  Pour joints  Control joints  Expansion joints  Water stops  Rebar and any embedded elements modeled at congested areas where specified by project BIMXP which is typically with in a set distance from the area of congestion.  Void boxes  Anchor rods  Dowels  Post-tension profile and strands if required by the BIMXP. 400 Element modeling to include:  Actual slab dimensions and profiles with fully modeled rebar  Post tensioning components  All joints  Water proofing  Finish A4020 21-01 40 20 Structural Slabs-on-Grade Includes: Self-supporting slab construction not supported continuously by earth or compacted fill. Includes formwork, accessories, reinforcement, concrete, and finishing. Includes Slabs-On-Grade Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Associated Masterformat Sections: 03 30 00 100 See A40 200 See A40 300 Element modeling to include:  Overall size, thickness and geometry of the slab-on- grade  Main openings such as elevators and other shafts greater than or equal to 12” in any dimension  Slab depressions  Edge turn downs  All sloping surfaces included in model element with exception of elements affected by manufacturer selection which are not known at this LOD. Such conditions could include floor geometry differences where different specified manufacturers will not be known until the actual system is selected. 16 A4010-LOD-350 Standard Slabs-on-Grade 17 A4020-LOD-300 Structural Slabs-on-Grade
  • 34. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .33 350 Element modeling to include:  All sleeve penetrations and MEP openings  Pour joints  Control joints  Expansion joints  Water Stops  Rebar and any embedded elements modeled at congested areas where specified by project BIMXP which is typically with in a set distance from the area of congestion.  Void boxes  Anchor rods  Moisture retarder  Dowels  Post-tension profile and strands modeled if required by the BIMXP 400 Element modeling to include:  Fully modeled rebar  Post tensioning components  All joints  Water proofing A4030 21-01-40-30 Slab Trenches TBD A4040 21-01-40-40 Pits and Bases TBD A4090 21-01-40-90 Slab-On-Grade Supplementary Components TBD A60 21-01-60 Water and Gas Mitigation TBD A6010 21-01-60-10 Building Subdrainage TBD A6020 21-01-60-20 Off-Gassing Mitigation TBD A90 21-01-90 Substructure Related Activities TBD A9010 21-01-90-10 Substructure Excavation TBD A9020 21-01-90-20 Construction Dewatering TBD 18 A4020-LOD-350 Structural Slabs-on-Grade
  • 35. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .34 A9030 21-01-90-30 Excavation Support TBD A9040 21-01-90-40 Soil Treatment TBD
  • 36. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .35 B 21-02 00 00 SHELL Associated Masterformat Sections: 01 83 00 B10 21-02 10 Superstructure Associated Masterformat Sections: 01 83 13 100 Assumptions for structural framing are included in other modeled elements such as an architectural floor element that contains a layer for assumed structural framing depth; or, schematic structural elements that are not distinguishable by type or material. Assembly depth/thickness or component size and locations still flexible. B1010 21-02 10 10 Floor Construction Associated Masterformat Sections: 01 83 13 100 See B10 200 Model elements to include:  Floor with approximate dimensions  Approximate supporting framing members  Structural grids defined accurately B1010.10 21-02 10 10 10 Floor Structural Frame Includes: Structural elements required for support of floor construction within basements and above grade. Includes columns, girders, beams, trusses, joists. Includes cast-in-place concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Includes framed and sleeved openings for services. Includes Floor Construction Supplementary Components as appropriate. Specific structural systems within this section are listed as follows:  Concrete B1010.10.10  Precast Structural Inverted T Beam B1010.10.11  Precast Structural Column B1010.10.12  Masonry B1010.10.20  Steel Framing Columns B1010.10.30  Steel Framing Beams B1010.10.40  Steel Framing Bracing Rods B1010.10.50  Steel Joists B1010.10.60  Cold-Formed Metal Framing B1010.10.70  Wood Floor Trusses B1010.10.80 Associated Masterformat Sections: 03 30 00 / 03 40 00 / 04 20 00 / 05 10 00 / 05 20 00 05 21 23 / 05 42 00 / 05 44 00 / 06 11 00 / 06 13 00 / 06 13 26 / 06 17 33 / 06 17 36 06 17 53 / 06 18 13 / 06 18 16 / 06 50 00
  • 37. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .36 B1010.10.10 21-02 10 10 10 10 Floor Structural Frame [Concrete] Associated Masterformat Sections: 03 30 00 / 03 40 00 100 See B10 200 Element modeling to include:  Type of structural concrete system  Approximate geometry [e.g. depth] of structural elements 300 Element modeling to include:  Composite model assembly by type with overall thickness that accounts for framing and finish specified for the wall system. [Refer to LOD350 and LOD400 for individually modeled elements]  Specific sizes and locations of main concrete structural members modeled per defined structural grid with correct orientation  Concrete defined per spec [strength, air entrainment, aggregate size, etc.]  All sloping surfaces included in model element with exception of elements affected by manufacturer selection 350 Element modeling to include:  Reinforcing Post-tension profiles and strand locations  Reinforcement called out, modeled if required by the BIMXP, typically only in congested areas  Pour joints and sequences to help identify reinforcing lap splice locations, scheduling, etc.  Expansion Joints  Embeds and anchor rods  Post-tension profile and strands modeled if required by the BIMXP  Penetrations for items such as MEP  Any permanent forming or shoring components  Shear reinforcing and stud rails  Critical structural zones for coordination, including but not limited to zones that cannot be penetrated, cut, or damaged 400 Element modeling to include:  All reinforcement including post tension elements detailed and modeled camber, chamfer, etc.
  • 38. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .37 B1010.10.11 21-02 10 10 10 11 Precast Structural Inverted T Beam [Concrete] Includes: Structural elements required for support of floor construction within basements and above grade. Includes columns, girders, beams, trusses, joists. Includes cast-in-place concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Includes framed and sleeved openings for services.Includes Floor Construction Supplementary Components as appropriate. Associated Masterformat Sections: 03 30 00 / 03 40 00 / 04 20 00 / 05 10 00 / 05 20 00 05 21 23 / 05 42 00 / 05 44 00 / 06 11 00 / 06 13 00 / 06 13 26 / 06 17 33 / 06 17 36 06 17 53 / 06 18 13 / 06 18 16 / 06 50 00 100 See B10B10 200 Element modeling to include:  Type of structural concrete system  Approximate geometry [e.g. depth] of structural elements 19 B1010.10-LOD 200 Precast Structural Inverted T Beam [Concrete] 300 Element modeling to include:  Specific sizes and locations of main concrete structural members modeled per defined structural grid with correct orientation  Concrete defined per spec [strength, air entrainment, aggregate size, etc.]  All sloping surfaces included in model element with exception of elements affected by manufacturer selection 20 B1010.10-LOD 300 Precast Structural Inverted T Beam [Concrete]
  • 39. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .38 350 Element modeling to include:  Reinforcing Post-tension profiles and strand locations  Reinforcement called out, modeled if required by the BIMXP, typically only in congested areas  Pour joints and sequences to help identify reinforcing lap splice locations, scheduling, etc.  Lifting devices  Expansion Joints  Embeds and anchor rods  Post-tension profile and strands modeled if required by the BIMXP  Penetrations for items such as MEP  Any permanent forming or shoring components 21 B1010.10-LOD 350 Precast Structural Inverted T Beam [Concrete] 400 Element modeling to include:  All reinforcement including post tension elements detailed and modeled  Finishes, chamfer, etc. 22 B1010.10-LOD 400 Precast Structural Inverted T Beam [Concrete]
  • 40. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .39 B1010.10.12 21-02 10 10 10 12 Precast Structural Column [Concrete] Includes: Structural elements required for support of floor construction within basements and above grade. Includes columns, girders, beams, trusses, joists. Includes cast-in-place concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Includes framed and sleeved openings for services. Includes Floor Construction Supplementary Components as appropriate. Associated Masterformat Sections: 03 30 00 / 03 40 00 / 04 20 00 / 05 10 00 / 05 20 00 05 21 23 / 05 42 00 / 05 44 00 / 06 11 00 / 06 13 00 / 06 13 26 / 06 17 33 / 06 17 36 06 17 53 / 06 18 13 / 06 18 16 / 06 50 00 100 See B10B10 200 Element modeling to include:  Type of structural concrete system  Approximate geometry [e.g. depth] of structural elements 23 B1010.10- LOD 200 Precast Structural Column [Concrete]
  • 41. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .40 300 Element modeling to include:  Specific sizes and locations of main concrete structural members modeled per defined structural grid with correct orientation  Concrete defined per spec [strength, air entrainment, aggregate size, etc.]  All sloping surfaces included in model element with exception of elements affected by manufacturer selection 24 B1010.10 - LOD 300 Precast Structural Column [Concrete] 350 Element modeling to include:  Reinforcing Post-tension profiles and strand locations  Reinforcement called out, modeled if required by the BIMXP, typically only in congested areas  Pour joints and sequences to help identify reinforcing lap splice locations, scheduling, etc.  Expansion Joints  Lifting devices  Embeds and anchor rods  Post-tension profile and strands modeled if required by the BIMXP  Penetrations for items such as MEP  Any permanent forming or shoring components 25 B1010.10 - LOD 350 Precast Structural Column [Concrete]
  • 42. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .41 400 Element modeling to include:  All reinforcement including post tension elements detailed and modeled  Finishes, chamfer, etc. 26 B1010.10 - LOD 400 Precast Structural Column [Concrete] B1010.10.20 21-02 10 10 10 20 Floor Structural Frame [Masonry] Associated Masterformat Sections: 04 20 00 100 See B10 200 Element modeling to include:  Type of structural masonry system 300 Element modeling to include:  Specific sizes of main structural elements modeled per defined structural grid with correct dimensions  Rough openings with reinforcement and lintels called out  350 Element modeling to include:  Actual location and shape of structural masonry element  All exposed embeds or reinforcement such as lintels  All penetrations detailed and modeled  Expansion joints  Grouted cell locations
  • 43. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .42 400 Element modeling to include:  Waterproofing  Coursing  Reinforcing B1010.10.30 21-02 10 10 10 30 Floor Structural Frame [Steel Framing Columns] Associated Masterformat Sections: 05 10 00 100 Generic column element, See B10. 200 See B101010 300 Element modeling to include:  Specific sizes of main vertical structural members modeled per defined structural grid with correct location and orientation 27 B1010.10-LOD-100 Floor Structural Frame [Steel Framing Columns] 28 B1010.10-LOD-200 Floor Structural Frame [Steel Framing Columns] 29 B1010.10-LOD-300 Floor Structural Frame [Steel Framing Columns]
  • 44. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .43 350 Element modeling to include:  Actual elevations and location of member connections  Main elements of typical connections applied to all structural steel connections such as base plates, gusset plates, anchor rods, etc.  Any miscellaneous steel members with correct orientation  Any steel structure reinforcement such as web stiffeners, sleeve penetrations, etc. 30 B1010.10-LOD-350 Floor Structural Frame [Steel Framing Columns] 400 Element modeling to include:  Welds  Coping of members  Cap pates  Washers, nuts, etc.  All assembly elements 31 B1010.10-LOD-400 Floor Structural Frame [Steel Framing Columns] B1010.10.40 21-02 10 10 10 40 Floor Structural Frame [Steel Framing Beams] Associated Masterformat Sections: 05 10 00 / 05 20 00 / 05 21 23 100 See B10 200 See B1010 300 Element modeling to include:  Specific sizes of main horizontal structural members modeled per defined structural grid with correct orientation, slope and elevation  32 B1010.10-LOD-300 Floor Structural Frame [Steel Framing Beams]
  • 45. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .44 350 Element modeling to include:  Actual elevations and location of member connections  Main elements of typical connections applied to all structural steel connections such as base plates, gusset plates, anchor rods, etc.  Any miscellaneous steel members with correct orientation  Any steel structure reinforcement such as web stiffeners, sleeve penetrations, etc. 33 B1010.10-LOD-350 Floor Structural Frame [Steel Framing Beams] 400 Element modeling to include:  Welds  Coping of members  Bent plates, cap pates, etc.  Bolts, washers, nuts, etc.  All assembly elements 34 B1010.10-LOD-400 Floor Structural Frame [Steel Framing Beams] B1010.10.50 21-02 10 10 10 50 Floor Structural Frame [Steel Framing Bracing Rods] Associated Masterformat Sections: 05 10 00 100 See B10 200 See B1010 300 Element modeling to include:  Specific sizes of main structural braces modeled per defined structural grid 35 B1010.100-LOD-300 Floor Structural Frame [Steel Framing Bracing Rods]
  • 46. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .45 350 Element modeling to include:  Connection details  Actual elevations and location of member connections  Main elements of typical connections applied to all structural steel connections such as base plates, gusset plates, anchor rods, etc.  Any miscellaneous steel members with correct orientation 36 B1010.100-LOD-350 Floor Structural Frame [Steel Framing Bracing Rods] 400 Element modeling to include:  Welds  Clevis  Bolts, washers, nuts, etc.  All assembly elements 37 B1010.100-LOD-400 Floor Structural Frame [Steel Framing Bracing Rods] B1010.10.60 21-02 10 10 10 60 Floor Structural Frame [Steel Joists] Associated Masterformat Sections: 05 10 00 / 05 20 00 / 05 21 23 100 See B10 200 Element modeling to include:  Approximate depth 38 B1010.10-LOD-200 Floor Structural Frame [Steel Joists]
  • 47. Specification Version: 2016 www.bimforum.org/lod Uniformat Omniclass Reference Part II Attribute Tables for non-graphical information Back to TOC Copyright © 2016 by BIMForum. All rights reserved .46 300 Element modeling to include:  Joist size, depth, slope, and material  Spacing and end elevations  Joist seat depth  39 B1010.10-LOD-300 Floor Structural Frame [Steel Joists] 350 Element modeling to include, information needed for cross trade collaboration such as:  Actual final joist profile locations with accurate panel points  Joist bridging and lateral braces.  Fire protection coating  Any miscellaneous steel pertaining to the joist  Joist seat width  Erection details for installation  Chord and web member section profiles are defined  Joist layout in coordination with metal deck fasteners would be confirmed Non-standard joist seat depths andor sloping joist seat 40 B1010.10-LOD-350 Floor Structural Frame [Steel Joists]

Chủ Đề